DC Anantnag directs for expedition of work on Vailoo Singpore tunnel NH-244

Calls for prompt land survey, settlement of issues

Press Trust of Kashmir | Anantnag : The Deputy Commissioner (DC) Anantnag Dr. Piyush Singla, in a meeting with concerned officers, directed for expedition of work on Vailoo Singpore Tunnel, Ahlan Vailoo and Vailoo Donipawa stretches of NH-244.

It was informed by GM NHIDCL that the identification of land for 10 km approach road from Vailoo to Ahlan (tunnel spot) has been done besides work on Vailoo Donipawa stretch is under process from Akingam downwards.

The DC stressed for prompt verification and survey of land from Vailoo to the tunnel in a time bound manner so that the project is completed at the earliest.

Also Read : Pharmacist working at CHC Batote without availing a single leave in past one year.

He directed for issuing land title verification, pollution control clearance, NOCs etc. to ensure the work is expedited.

Assuring the NHIDCL authorities full support from administration, the DC directed SDM Kokernag to constitute revenue teams which will coordinate on ground with them.

He also called for taking welfare measures for the local people.

The meeting was also attended by ADC (G), ACR, engineers of NHIDCL and other concerned officers.(PTK)

Also Read : Hit and run case man killed in Shangus Anantnag accident

SCEOND NEWS : DC Kupwara inspects SDH Kralpora.

Directs for completion of hospital block within stipulated time frame

Press Trust of Kashmir |KUPWARA: The Deputy Commissioner (DC) Kupwara, Imam Din today visited Sub District Hospital Kralpora and took stock of the functioning of the hospital.

During the visit, the DC inspected various sections of the hospital including Covid Immunization Centre, OPD, IPD, Female ward and also inspected the attendance of the staff.

He directed the concerned Block Medical Officer to ensure hassle free treatment and medical care of the patients.

Also Read : Reports fake, No temple torched in Srinagar: Police

The DC also inspected ongoing construction of various sections of the hospital building. He directed the DGM JKPCC to speed up the progress of work on remaining sections of the hospital building and ensure its completion within the stipulated time frame.(PTK)

You can connect with Press Trust of Kashmir on Facebook,  Whatsapp, and

mail us at ptkeditor@gmail.com to send us your suggestions and writeups